Delivery Times and Links to Delivery Areas
The following show the average delivery times for the different ranges. It’s sometimes possible that the delivery times will be less but we rather be honest about the expected delivery times rather than giving misleading times as some companies quote.
Also don’t be misled by other companies quoting 10 days delivery, 15 days delivery, 20 days delivery etc. When days are mentioned in deliveries they usually relate to ‘working days’. This means 10 days = two weeks, 15 days = three weeks and 20 days – four weeks not quite the same as you might have expected.
Supplier | Current Delivery Times | Delivery Areas |
Diamond Timber Garden Buildings | Approximately 6-8 weeks | Diamond Delivery Area |
Platinum Timber Garden Buildings | Approximately 4-6 weeks (+4 weeks if PVCu upgrade specified) | Platinum Delivery Area |
Royal Garden Rooms | Approximately 8-10 weeks | Royal Delivery Area |
Regent Garden Rooms | Approximately 10-12 weeks | Regent Delivery Area |
Trentan Log Cabins | Approximately 4-6 weeks for self build or approximately 8-12 weeks if installation specified | Trentan Delivery Area |
Humber Log Cabins | Approximately 4-6 weeks for self build or approximately 8-12 weeks if installation specified | Humber Delivery Area |
Lidget Concrete Garages | Approximately 14-16 weeks for standard height buildings or + 8 weeks for extra high buildings | Lidget Delivery Area |
Capital Steel Buildings | 10-12 weeks or + 2 weeks if delivery required on a smaller lorry | Capital Delivery Area |
SafeStore Gold Standard Secure Sheds | Approximately 12-14 weeks | SafeStore Delivery Area |
Concrete Base Construction | Approximately 10 weeks | |
Timber Base Construction | Approximately 4-6 weeks | |
Concrete/Asbestos Building Removal | Approximately 6-8 weeks | |
Timber Building Removal | Approximately 4-6 weeks | |
These are estimated delivery times and may vary depending upon raw material and staff availability. The times quoted do not make allowance for any Christmas closedowns. Please check at time of ordering if timing is crucial. Please also be aware - if requesting additional services such as base construction or building removal - that these may be longer than the quoted delivery time for the building itself and this may impact the overall timeframe. |